References

(Pre)Assembly

Our facilities are perfectly suitable for the (pre) assembly of wind tubine generators and rotor stars, as we executed before for offshore wind farms such as BARD Offshore I and Alpha Ventus.

Borkum West II (2014)

Pre-assembly of 40 x Areva M5000 wind turbine generators and load out of rotor stars.

BARD Offshore I (2013)

Pre-assembly of 80 x Bard 5.0 wind turbine generator and load out of rotor stars.


Eemshaven (2012)

Pre-assembly of 2 x REpower 6M wind turbine generators at Wagenborg Terminal.

Alpha Ventus (2009)

Pre-assembly of 6 x REpower 5M and 6 x Areva M5000 wind turbine generator and load out of rotor stars.