Our terminals are excellent for the transhipment and storage of heavy wind tubine components. Below some reference projects..

Eemshaven (2012)

Transhipment of 2 x REpower 6M wind turbine generators at Wagenborg Terminal with 750 tons crawler crane and conventionel trailers.

Borkum West II (2011)

Transhipment and temporary storage of 40 x Areva M5000 wind turbine generators.


BARD Offshore I (2010)

Transhipment and temporary of tripods and pre-piles concerning 80 x Bard 5.0 wind turbine generators.

Alpha Ventus (2009)

Transhipment and temporary storage of 6 x Areva M5000 wind turbine generators.


Alpha Ventus (2009)

Transhipment and temporary storage of 6 x REpower 5M wind turbine generator.

Westereems (2009)

Transport, transhipment, storage and pre-assembly of 64 x Enercon - E82 wind turbine generators.